SHPU to power mission-critical pre-piling template
In order to have full insight and control during the offshore piling operations that were part of the construction of the Beatrice OWF, Seaway Heavy Lifting contracted Seatools for the design and delivery of a piling template instrumentation and control system.
The scope of supply included the complete (subsea) hydraulic system which consisted of a large number of hydraulic actuators. In order to power the entire subsea hydraulic system, Seatools applied a field-proven Seatools 37.5 kW SHPU.
Continue to the in-detail project page or the Subsea HPU solution page