Accurate registration of a plough position during subsea cable installation projects

For a cable installation project performed by Boskalis the HighWire® taut wire system was applied for real time monitoring of the position of a subsea plough. This position reference system excels at typical North sea conditions present during offshore windfarms installation operations such as strong tidal currents, limited visibility, environmental noise and mixed zone operations. The system performed excellently by achieving high accuracy levels at every operational condition.

Continue to the in-detail project page or the Taut wire solution page